Billy

Sturgis Motorcycle Rally 2012 Survivor T-Shirt 2XL Gildan Heavy Cotton Black - Image 1
1 / 6

Gildan

Sturgis Motorcycle Rally 2012 Survivor T-Shirt 2XL Gildan Heavy Cotton Black

$30.00

💖 One of a kind — only 1 available

Delivery to

Pickup in-store from Hessmer, Louisiana, 71341

As soon as Today

Free
HEIGHT
1 Inches
WIDTH
1 Inches
DEPTH
1 Inches
Vintage Gildan Sturgis 2012 Black Hills Rally "Take the Ride - Survivor" double-sided t-shirt in size 2XL. This black motorcycle tee features a bold skull and eagle graphic on the front with the text "72nd Annual 2012 Rally Survivor" and "Take the Ride Sturgis". Made from heavy cotton, this t-shirt is a classic piece for any motorcycle enthusiast or collector. Excellent pre-owned condition with no significant flaws. Perfect for retro motorcycle festivals or everyday wear to show your rally pride.
FAUBION’s Fabulous Finds396 Roy Ln, Hessmer, LA 71341, USA
1 in stock
Age Group
Adults
Care Instructions
Machine washable
Clothing Features
Other
Color
Black
Fabric
Cotton
Neckline
Crew
Pattern
Art
Size
Double extra large (XXL)